The Darwin Private Hospital Mental Health Unit is an eight million project consisting of 18 wards and a day treatment area connected to the existing Darwin Private Hospital.
Finishes are in line with a hotel fit-out to eliminate the possibility of self-harm with services connected from the existing hospital underground. Services include power, gas, water, all comms/security, nurse call and fire. A mechanical system was created as standalone inclusion, allowing for future expansion. A concrete roof was erected ready for expansion, taking the total floor area to 1500m2.
In addition to this new project construction, Sunbuild connected the top floor of the existing bridge between RDH and Darwin Private. This included a redesign and structural work on the existing bridge to ensure project compliance.
The Darwin Private Hospital Mental Health Unit is an eight million project consisting of 18 wards and a day treatment area connected to the existing Darwin Private Hospital.
Finishes are in line with a hotel fit-out to eliminate the possibility of self-harm with services connected from the existing hospital underground. Services include power, gas, water, all comms/security, nurse call and fire. A mechanical system was created as standalone inclusion, allowing for future expansion. A concrete roof was erected ready for expansion, taking the total floor area to 1500m2.
In addition to this new project construction, Sunbuild connected the top floor of the existing bridge between RDH and Darwin Private. This included a redesign and structural work on the existing bridge to ensure project compliance.