Project Profile

Darwin Private Hospital – CSSD Facility

Project Budget

$5M

Construction Period

October 2022 to February 2024

Address

19 Florey Ave, Tiwi NT 0801

Project Description

The Central Sterile Services Department (CSSD) expansion at Darwin Private Hospital involved the design and construction of a two-story facility to enhance sterilisation services and support the hospital’s operational needs.

The expansion was vital in meeting the growing demands of its operations, ensuring the highest standards of patient care. The project had to seamlessly integrate with the existing hospital infrastructure without disruption to the hospital’s occupants and daily functioning. This required a highly coordinated and efficient effort along with keeping our client informed at every step to ensure minimal disruption.

Alongside the project’s integration, stringent measures were implemented to manage noise and dust which were crucial for preserving the sterile environment adjacent to active operating theatres.

Key Features:

  • Two-story building with a suspended deck concrete floor, core-filled blockwork walls, and a structural steel roof structure.
  • Incorporation of essential services, including chilled water and air handling for the HVAC system, reverse osmosis water supply for washers and sterilizers, medical grade compressed air system, and upgraded electrical infrastructure.

Winner EBC Health Facility 2024 Award

Ready to discuss your next project?

Get in touch