:TAMINMIN HIGH SCHOOL – BUILDING 15
| VALUE: |
|
| Original Price |
$1,603,682 |
| Final Price |
$1,479,999 |
DESCRIPTION
This building is an extension to the existing high school. It is a stand along building connected only to the existing school via a covered walkway.
The building is generally constructed of masonry walls with structural steel roof frame sheeted with metal cladding.
Also, three other individual rooms were renovated with the existing school. |
|
|
| Approved Completion Date: |
30 September 1998 |
his facility was constructed within an operating school, which required Co-ordination and constant control over all the construction activities.
It is a first for the NT Education Department with the building housing in excess of 180 computers all networked which is set up to offer students advanced studies. |
| The reduction in the contract figure was brought about by Sunbuild providing alternative material and design relating to the PC Sums that were valued at $220,000. |