APIN CONTRACT C96
KANGAROO FLATS TRAINING AREA

VALUE:  
Original Price $3,463,000
Final Price $3,487,422
Price variance was due to client instigated variations.

DESCRIPTION:
This two-storey building used a steel frame structure lined with metal cladding and polished tiles for the walls with timber trusses and metal clad roofing. It has 1000m2 of office and retail space, which overlooks the marina.

CLIENT

Department of Defence

ROLE

Design and Construct contractor
PERIOD OF ENGAGEMENT:
Start Date 28 July 1999
Original Completion Date 14 December 1999
Extended Completion Date: 17 December 1999
Approved Completion Date: 17 December 1999
REMARKS:  

The project involved a close understanding of the siting board requirements along with the safety issue and needs of the defence force to create a facility that would work for them in the field. As the brief was very general, we worked closely with defence personnel and achieved a facility that has been claimed by many in the defence ranks as “the best they have seen”.

Other issues that had to be considered in the design, was the selection of fitting and fixtures to handle the high PH in the bore water, the issue of natural ventilation opposing security as no care-taker will be on site and the intermittent use of the facility.

Also the construction period was extremely tight i.e. 20 weeks and leading up to the wet season, we progressively staged the design drawing in sections of work, which was needed first and started immediate construction. No work could start on any of the ranges until the road was through.
We had geared ourselves up to handle this and within 5 days of the project starting, we had selected, cleared and prepared the sub-grade of the roads which allowed immediate access.

INNOVATION:  
At tender time we had assessed the recommended path for the road to one site. This had 6 difficult and long flood plains to cross. The design team investigated an alternative route which only needed to cross 1 creek, was 1km shorter, built on a low ridge line and connected to other new roads which gave the defence better control over all 5 ranges and only needed 1 sentry to do it.

PERSONNEL:

 
Project Director Neil Sunners
Project Manager (Camp) Graeme Shaw
Project Supervisor (Ranges) Tony Olsen
Contracts Administrator Cameron King

DESIGN TEAM :

 
  TCM Meinhardt
HT Reinhold
Colless and O’Neill
Builders Certifier Scott Wilson
Irwin Johnson


 




 

 

 

Home - About Sunbuild - Projects Portfolio - Careers at Sunbuild - Our Awards - Contact Sunbuild

©2006 Sunbuild Pty. Ltd. This Website is protected by International Law.
Website design, search engine placement & internet advertising by Australian Business Productions